| Ballasted Specifications |
|
|
|
| 1.01
System Description |
|
A. |
Membrane is
loose-laid over insulation and held in place with stone ballast or pavers.. |
|
|
|
| 3.03
Installation Instructions |
|
A. |
Install in accordance
with International Diamond Systems specification manual. |
|
B. |
Roll EPDM membrane
over insulation. Position without stretching. Allow to relax for 30 min. before
continuing. |
|
C. |
Overlap membrane a
minimum of 4" and splice using adhesive and lap sealant or seam tape (seam tape does
not require caulk). |
|
D. |
Complete flashing
details for protrusions and walls. |
|
E. |
Cover membrane with
minimum of 1o lbs/ft. 3/4" to 1 1/2" washed river bottom stone or pavers of
equal weight. |
|
|
|
(to ballasted) (to specifications) |