I. General
1.01 Description of the Diamond
105 System
The Diamond
105 Non-Penetrating Roofing System is a unique EPDM singly ply roofing system. The EPDM
membrane is mechanically fastened to the roof deck by means of the patented 105 System
plate. The 105 System plate is fastened to the deck beneath the EPDM membrane thus giving
a true non-penetrating roofing system.
The patented 105 System plate is a 7"
x 7" composite plate consisting of the following:
A .060 EPDM sheet, factory laminated to a
.030 elastomeric tape, a 4" 16 gauge galvanized steel disk adhered to the elastomeric
tape, and a.030 elastomeric tape adhered on top of the steel disk. The plates are
available with a 1" center hole for use with auger screws or ¼" counter sunk
center hole for fastening with steel screws. The top of the plate is covered with a
release paper.
The Diamond 105 System is available in .045
or .060 inch EPDM sheets.
1.01-1
The Diamond 105 System must be installed in strict accordance with specifications approved
by International Diamond Systems, Toledo, Ohio.
1.01-2
The Diamond 105 System must be installed using recognized safety standards and procedures
for the products used. Material Safety Data Sheets will be provided as prescribed by law.
1.02 Submittals
1.02-1
A dimensional drawing of the overall roof showing penetrations, drains, perimeter details,
etc. must be furnished to IDS. Flashing details as used must be done according to approved
details in this manual.
1.02-2
No deviation shall be made from IDS specifications or the approved roof drawings without
prior written permission of IDS.
1.02-3
When field conditions require changes, Qualified Contractors are to supply IDS with
as-built construction drawings.
1.03 Material Storage an
Handling
1.03-1
Keep all materials stored in their original unopened containers.
1.03-2
Keep all containers of adhesives, cleaners, and primers in areas away from sparks, open
flames and excessive heat. Always use proper protective equipment when handling hazardous
materials.
1.03-3
Store all materials between 60 and 80 degrees F. Start work with adhesives, sealants and
tape products at temperatures between 60 and 80 degrees F.
1.03-4
Store all adhesives, sealants and tape products in a dry area protected from water and
direct sunlight. Damaged material will be replaced at the contractors expense.
1.04 Site Conditions
1.04-1
Do not use bitumen base, coal tar base, oil base or plastic roof cements.
1.04-2
Do not install directly onto low melting point asphalt.
1.04-3
Do not allow waste products (petroleum, grease, oil, solvents, animal fat, etc.) or direct
steam to come in contact with the IDS System. Present any exposures not typical for normal
installation to IDS for assessment of impact to the roof systems total performance.
1.04-4
Do not install EPS roof insulation directly onto coal-tar roof surface.
1.04-5
Protect all material and components from direct contact with steam or heat sources in
excess of 180 degrees F.
1.04-6
Splicing and bonding surfaces must be clean and dry.
1.04-7
Adhesives, sealants and primers and their fumes contain petroleum distillates and
therefore are Extremely Flammable. Do not breathe vapors for extended periods. Avoid use
near fire or other heat sources. Do not place open containers near fresh-air intake
ventilators. Consult container labels and Material Safety Data Sheets for specific
information.
1.04-8
Roof surface must be free of ponded water, ice and snow prior to application. The roof
surface should be designed to be water-free within 48 hours after precipitation.
1.04-9
Do not apply IDS roof systems in inclement weather. High humidity at lower temperatures
may cause moisture to condense and freeze. Do not apply systems when these conditions
exist.
1.04-10
The minimum roof slope will be determined by the building owner or his designee. IDS
recommends a minimum roof slope of 1/8 inch per horizontal foot.
1.05 Quality Assurance
1.05-1
IDS roofing materials must be applied by an approved applicator. It is the building
owners responsibility to select a qualified, approved contractor. International
reserves the right to refuse approval.
1.05-2
As IDS reserves the right to revoke approval without notice, it is the building
owners responsibility to verify his qualified roofers status.
1.05-3
If a warranty is requested, the approved applicator must certify that all IDS products
have been installed according to applicable specifications and details. After
certification, an IDS technical representative will visually inspect the roofing system
and materials. This inspection is not certification that all conditions on the roof and
all elements of the roofing system are in conformance with IDS specifications. IDS is not
responsible for the products of others or conditions not discoverable by visual
inspection.
1.05-4
It is the building owners responsibility to have sufficient knowledge to interpret
all specifications in this manual.
1.05-5
These specifications are in lieu of all other specifications, written or implied.
1.05-6
Building codes are above and beyond the intended purpose of these specifications. IDS
cannot be responsible for adherence to local building codes. It is the responsibility of
the building owner or his designee to notify IDS of local requirements.
1.06 Warranty
1.06-1
A membrane systems warranty is available for commercial and industrial buildings within
the United States and Canada and applies only to the products supplied by IDS.
1.06-2
Installation subjected to conditions not typical are not warrantable.
1.06-3
IDS is not responsible for the cleanliness or the discoloration of the roofing membrane
caused by conditions including, but not limited to, dirt, pollutants or biological agents.
IDS is not responsible for acts of God or vandalism, etc.
1.06-4
IDS assumes no liability for internal moisture. Changes or repairs made to the roofing
system without prior written authorization from IDS will void the warranty.
1.06-5
To obtain the IDS warranty, fill out the Request for Warranty form certifying the roof has
been installed according to IDS specifications and that the building owner or his designee
have approved all specifications.
1.06-6
The roofing contractor is responsible for workmanship for a period of two (2) years from
the issue date of the warranty.
1.06-7
For more detailed information, please refer to the warranty section of this manual.
ll. Products
2.01 Product
Statement
2.01-1
All components of the Diamond 105 roofing system are to be products of IDS or accepted and
approved, in writing, by IDS.
2.01-2
Products by other manufacturers are not covered by the IDS warranty. See Full System
Warranty for exception.
2.02 Membrane
2.02-1
IDS EPDM, .045 or .060 inches thick is available in widths of 5, 7, 10, 20, 30, 40, and 50
feet and in lengths of 50 or 100 feet.
2.03 Insulation
2.03-1
A minimum of ½" of approved insulation board must be placed over the existing
substrate. Insulation that is placed directly onto metal deck must be of proper density
and thickness to support normal traffic and meet building and fire codes.
2.03-2
Install only as much insulation as can be covered and completed before the end of the day
or before inclement weather.
2.03-3
Stagger insulation joints when installing multiple layers.
2.03-4
Contact IDS for specific insulation restrictions.
2.04 Fasteners
2.04-1
On-site tests should be performed by an independent laboratory to determine the actual
pullout values of possible fasteners.
2.04-2
Refer to section 3.02 and section 7 of this manual for specific fastener information.
Note: Only domestic steel
fasteners are approved for use with IDS roofing systems. All fasteners must be tested and
approved by Factory Mutual prior to approval for use by IDS. Contact IDS for complete list
of approved fasteners.
2.05 Attachment
Plates
2.05-1
Insulation plates and fasteners must be tested by Factory Mutual and accepted by IDS prior
to project bid and installation.
2.05-2
The Diamond 105 System shall use only the patented 7" x 7" self-adhering 105
Plates as supplied by IDS. No other attachment plates are acceptable.
lll. Execution
3.01 Inspection
and Preparation for New Construction
3.01-1
It is the building owner or his designees responsibility to provide adequate decking
for the application of the IDS roofing system.
3.01-2
The roofing contractor shall confirm the structural integrity of the existing deck and
specify replacement or repair as required.
3.01-3
Fluted metal decks require an overlayment rigid enough to withstand the traffic to which
the roof may be subjected.
3.01-4
New membrane substrate must be clean, dry, smooth, free of sharp edges, loose or foreign
materials. Gaps greater than ¼ inch must be filled with appropriate material.
3.01-5
Wood nailers shall be pressure treated #2 lumber or better. Wood nailers treated with
asphalt or creosote are not acceptable.
3.02 Roof Deck
Criteria
3.02-1
The roofing contractor shall confirm the structural integrity of the roof deck and replace
or repair as required.
3.02-2
22 Gauge metal
Due to the fluted design of most metal decks, a specific effort is required to insure ¾
inch deck penetration by all fasteners. Pre-bid investigation of deck alignment, physical
conditions and rib depth is recommended. Pullout resistance of minimum 360 pounds is
required.
3.02-3
Structural concrete
Rated at 3000 psi or greater, into which at least 1 inch penetration is possible.
Fasteners must penetrate the deck a minimum of 1 inch and a maximum of 1 ½ inches.
Structural concrete requires the drilling of pilot holes.
Due to wide variations in "structural
concrete", only on-site trial of drill bits and fasteners can determine
compatibility. Pull-out resistance of 800 pounds minimum is required.
3.02-4
Cement-Wood Fiber and Gypsum
Use IDSs Liquid Auger Seal Screw. Pull-out resistance of 360 pound minimum required.
3.03 Execution
(Retrofit)
3.03-1
All wet insulation and substrate must be removed. Depressions or holes must be filled with
an appropriate material.
3.03-2
Sprayed in-place urethane foam is not an approved substrate for IDS systems.
3.03-3
When re-roofing over single-ply membranes:
- Cut and ventilate the existing membrane to avoid moisture
build up.
- Substrate must be dry, clean, smooth, free of sharp edges,
loose and foreign material.
- A minimum ½ inch recovery board or approved insulation is
required.
3.03-4
IDS recommends consulting the S.P.R.I.s most recently published guidelines for
retrofitting existing roof systems.
3.03-5
When re-roofing over existing BUR:
- A minimum ½ inch recovery board or approved insulation is
required.
- IDS requires all gravel surfaces be vacuumed or power
broomed for removal from the substrate. This will eliminate the excess weight and avoid
vertical instability of the recovery board or insulation, which could result in the
attachment screw penetrating the membrane.
- Before final application of the system the substrate must be
dry, clean, smooth, free of sharp edges, loose and foreign material.
3.04 Tear
Off
3.04-1
The roofing contractor must confirm the structural integrity of the roof deck and repair
or replace as required.
3.04-2
It is the building owner or his designees responsibility to provide adequate decking for
the application of IDS systems.
3.04-3
Fluted metal decks require an overlayment rigid enough to withstand the traffic to which
the roof may be subjected.
3.04-4
Tear off all existing material. The substrate must be dry, clean, smooth, free of sharp
edges, loose and foreign material. Gaps greater than ¼" must be filled with
appropriate material.
3.04-5
All decks must meet or exceed Factory Mutual pull-out test requirements.
3.05
Installation of the Diamond 105 System
3.05-1
Insulation Attachment
Install 4 x 8 sheets of an approved insulation board. Insulation fasteners
must be installed on all four corners of the insulation board 12" from each corner.
(Refer to D-1)
The 105 System requires a one row perimeter
of plates as follows:
- Gutter edge:
Starting from the gutter edge, the
perimeter row of 105 plates will be placed 1 foot from the edge 12" on center. (Refer
to D-2)
- Parapet wall:
The perimeter row of 105 plates must
be placed at the base of the parapet wall directly on the substrate 12" on center.
105 plates should always be installed flat on the substrate. (Refer to D-2)
- Diamond Pattern Layout:
- Install Diamond 105 Plates on all 4 corners of the 4 x
8 insulation.
- Install Diamond 105 Plates along the 8 edge of the
insulation halfway between the corner plates.
Install Diamond 105 Plates in the center
of the 4 x 4 pattern created in steps 1 & 2. Refer to details at the end
of this section for specific fastening requirements.
3.05-2
Membrane Placement
- Roll out and position the membrane and allow to relax for a
minimum of 30 minutes.
- Fold the membrane back halfway and apply activator sparingly
to the membrane with a sponge mop in line with the 105 Plates. Allow the activator to dry.
- Once the activator has dried remove the release paper from
the 105 Plates and float the membrane over the exposed plates. Remove release paper and
recover one row of plates at a time to avoid unnecessary wrinkling of the membrane.
- To insure proper mating of the plates to the membrane apply
pressure with a steel tile roller or a stiff bristled push-broom.
- Temporary closures and night seals that ensure moisture does
not damage the roofing system are the responsibility of the roofing contractor. (See
Nite-Seal)
3.05-3
Membrane Splicing
A. Seam Tape
- Fold back the top sheet to allow cleaning of both surfaces.
Clean both surfaces with clean natural fiber rags, dampened, but not saturated with Splice
Cleaner. Turn rags frequently and replace often. Particular attention should be given to
factory splices to remove excessive amounts of dusting agent. The splice area must be free
of any foreign material that may interfere with ultimate bonding.
- Stir Activator thoroughly before and during use. Apply
Activator sparingly to both sides of the seam lap with a sponge mop. Allow the Activator
to dry completely before proceeding. Drying time may vary due to weather conditions.
- When applying seam tape, allow 1/8 to ¼ inch overlap on the
outside edge of the top lap of the EPDM. Before the release paper is removed from the tape
roll with a steel roller perpendicular to the seam. After rolling, remove the release
paper and mate the two surfaces. Roll the completed seams. No caulking is needed.
Note: An additional
piece of seam tape will be needed at all cross seams. Always avoid back water seams.
- Flash all seams at change in direction in accordance with detail l-25.

B. Splice adhesive
- Position the membrane to overlap a minimum of 4 inches. Fold
the top sheet back to allow for cleaning of both surfaces to be spliced.
- Clean both surfaces using clean rags with International
Splice Cleaner to remove all dusting agent, dirt, and other contaminants that will affect
the completed splice. Allow to dry. Repeat as necessary to assure that the membrane is
completely clean. Change rags frequently.
- Thoroughly stir International Butyl Splice Adhesive before
and during use. Apply the Splice Adhesive using a 3" 4" wide solvent
resistant brush in an even, smooth coat with long painting type strokes. Apply the Splice
Adhesive to both surfaces at about the same time to allow equal drying. Apply at specified
coverage rate.
Note: Do Not use
circular motions when applying Splice Adhesive. Do Not use paint rollers, spray equipment,
or other mechanical equipment for application of Splice Adhesive.
- Allow the Splice Adhesive to flash off. Touch the Splice
Adhesive with a clean, dry finger to be sure that the adhesive is dry. If the Splice
Adhesive is dry none will transfer to your finger. If adhesive transfers the splice is not
ready for mating and should not be closed. Flash off time will vary due to weather
conditions.
- Roll the top sheet toward the bottom sheet until it falls
freely into place so as not to stretch or wrinkle the membrane.
- Apply pressure by brushing your hand across the entire
length of the seam. Roll the seam using a 1 ½" 2" wide silicone or hand
roller, roll the entire splice toward the outside edge of the splice then along the entire
length of the splice.
- Install T-Joint lap covers at all field seam and flashing
intersections. Install flashing at horizontal to vertical direction change.
- Wait a minimum of 4 hours and 24 hours maximum if weather
permits before caulking with Lap Sealant. If weather is threatening apply Lap Sealant
before leaving the project. Apply Lap Sealant in a continuous bead 3/8" to ¼"
wide along the length of the seam. Using the supplied Lap Sealant tool, feather
immediately, be sure to leave an adequate amount of Lap Sealant directly over the splice
edge.
3.05-4 Base
Tie In
Secure membrane at all locations where the membrane terminates or changes angles more than
2 inches in 12 inches (curbs, roof edge, interior walls, etc.) except for pipe
penetrations less than 18 inches in diameter or, square penetrations less than 6 inches
square.
- Install Diamond 105 Plates in accordance with details and
specifications in this manual.
See System section to determine
applicable Perimeter Base Attachment method or contact International.
3.05-5
Flashing & Details
A. Parapet Walls, Curbs, Skylights, Etc.
- Mechanically fasten 5/8" exterior grade or pressure
treated plywood in accordance with the project designers specifications over the following
substrates.
- Textured Masonry
- Gypsum or Gypsum Board
- Stucco
- Corrugated Metal
- Any Uneven Substrate
- Remove old, loose or unsecured flashing and excessive
amounts of asphalt to provide a smooth surface for the new flashing.
- Splice between flashing and the field sheet using Splice
Adhesive or Seam Tape prior to adhering to the vertical surface. USE CURED MEMBRANE
WHENEVER POSSIBLE. See DETAILS.
- Apply Bonding Adhesive to the vertical surface and flashing
at the same time to allow for the same amount of flashing off time. Apply Bonding Adhesive
using a roller.
- Allow Bonding Adhesive to dry until tacky to the touch. Test
readiness by touching with a clean, dry finger. If the Bonding Adhesive is dry no adhesive
will transfer to the finger. Flash off time will vary due to weather conditions.
- Roll the flashing up the wall into the adhesive being
careful to minimize wrinkling.
- Broom the flashing using a stiff bristled push broom. When
using Uncured Flashing roll with a hand roller.
- Terminate in accordance with applicable details.
- Cover T-Laps with a minimum 7" x 7" Cover Tape.
Roll T-Lap Cover with a hand roller.
B. Metal Drip Edges & Gutter Flanges.
- Seven (7) inch wide by 100 feet long Cover Tape should be
used to flash metal drip edge and gutter flanges. Never use it to flash seams at angle
changes. Never use it as a substitute for Uncured Flashings.
- Clean the metal and the membrane with clean rags, dampened
but not saturated with Splice Cleaner. Turn rags frequently and replace often. Particular
attention should be given to factory splices to remove excessive amounts of dusting agent.
Allow the Splice Cleaner to flash-off.
- Stir Activator thoroughly before and during use. Apply
activator sparingly to the metal and the membrane using a sponge mop. Allow Activator to
dry until all solvent has completely flashed-off.
- Apply the Cover Tape so that a minimum of 3 inches extends
onto the membrane and a minimum of 3 inches onto the metal. An additional piece of Uncured
Flashing is required at all metal edge overlaps where the Cover tape does not completely
cover the metal edge.
- Roll Cover Tape with a steel hand roller perpendicular to
the edge.


Back to Top